Lorry strike to building
First Reported 24/03/2023 Type External Building Damage Log 24/03/2023 Lorry strike to building 28/03/2023 GHR erected a safety barrier 28/04/2023 Council made safe Notes 31/03/2023 Hackney Council Building Control informed of issue 3/05/2023 Council confirm the panels have been made safe and it has been handed back to the…
-
Broken main door to atrium
First Reported 23/03/2023 Fix Date 17/06/2023 Fix Time (Days) 87 Type Communal Area Building Fault Log 23/03/2023 Following intermittent faults with the main door on the ground floor, Mare Street Side, the door has been taken out of service. 30/03/2023 Engineer visit no progress made on resolving the issue 02/04/2023 Door still…